Pro Timber Floor Soundproofing System – Bonded LVT
$0.00
Your Soundproofing System Calculator
Key Benefits
Highest performance timber floor option for loud noise and music — Green Glue Joist Tape, dual MLV layers, and SilentCork3 combine to deliver significantly better airborne and impact noise reduction than standard mat and underlay systems
Joist-level decoupling with Green Glue Joist Tape — applied directly to the joists before the new deck is installed, reducing vibration transfer at the structural level — a common weak point in timber floors
22mm STS TG4 structural deck — heavier and stiffer than the 18mm Essential board, providing a more solid base for the acoustic layers above and improving overall mass and rigidity
2 layers of 5kg MLV — double mass loaded vinyl with staggered joints adds dense mass to help reduce airborne sound transmission, including bass-heavy noise and music
SilentCork3 Acoustic Underlay with Mapei VS90 adhesive system — SilentCork3 provides additional impact reduction and a suitable bonding surface for the LVT finish, and is compatible with the Mapei Ultrabond Eco VS90 Plus adhesive included in the system
Suitable for bonded LVT installations — the SilentCork3 and Mapei VS90 combination provides a bonded LVT-ready substrate as part of the complete system
Advanced DIY system — requires lifting existing floorboards; suitable for competent DIYers or tradespeople comfortable with structural floor work
Built-in 5% waste allowance — calculator quantities include a 5% overage to account for cuts and waste, reducing the risk of under-ordering on site
Important Notes
This is an advanced DIY system and involves removing existing floorboards
Results will vary depending on joist spacing, void depth, existing ceiling below, and flanking paths
Sealant quantities are an approximation only and should be treated as a guide
The calculator is provided as a guide only, and final quantities should always be checked before ordering
Always follow the adhesive and flooring manufacturer’s guidance for installation and curing times
If the floor below is a sensitive area, consider addressing the ceiling below as well for best results
Installation Summary
Lift and remove existing floorboards
Apply Green Glue Joist Tape to joists
Install 22mm STS TG4 using 50mm cement board screws and PU adhesive
Install first layer of 5kg MLV
Install second layer of 5kg MLV, staggering joints where possible
Tape joints and seal perimeter gaps with AC95
Install SilentCork3
Use Mapei VS90 as required for a correct bonded LVT installation
For a more detailed installation guide click here.
Calculator Disclaimer
This calculator is intended as a guide only. Advanced Acoustics will not be held responsible for any decisions made as a result of using this calculator.